
Overview
Paving is the surface everyone sees and drives on, and it is the last thing our crews place on a job they have carried from raw dirt. First Water lays mainline and subdivision asphalt, commercial parking lots, and structural concrete, then finishes with milling, overlays, sealcoating, and striping.
The hot mix comes from our affiliated plant, Trinitas Materials, so quality is controlled from the aggregate up and the mix shows up at temperature instead of waiting in another supplier's line. One company controls the schedule from the grade to the final pull.
What We Self-Perform
Asphalt & Concrete Paving scope
- Mainline & Subdivision Paving
- Commercial Parking Lots
- Milling & Overlays
- Structural Concrete & Flatwork
- Sealcoating & Striping
- ODOT & Municipal Paving

Our crews place the final lift on mix from our own plant, so the last thing the owner sees is the part we control end to end.

The rest of the scope
We self-perform all five, sequenced crew to crew on one schedule.
Build With Us
Have a site that needs to become a project? Send us the plans. You'll get one number, one schedule, and one accountable partner, from raw ground to final pavement. Call 405-664-6200 or reach our estimating team at estimating@fwcis.com.



